Turbine Pelton 𝘓’𝘈𝘙𝘎𝘌𝘕𝘛𝘐𝘌𝘙𝘌

PELTON TURBINE MACHINING

As part of its rehabilitation programme for the French Hydro Power Plants, EDF has defined a number of priority sites including the LES CLAUX Dam.

After studying the EDF specifications, TACQUET INDUSTRIES has developed a procedure for the realization of on-site machining in compliance with the defined standards. This procedure was adopted and approved by EDF.

Summary of the intervention by TACQUET INDUSTRIE.

  • Two diameter concentric bore 1382 mm,
  • Surfacing of the two parallel faces from diameter 1382 to diameter 1560,
  • Tolerance: 5/100 th.